The door that swings the wrong way
Found on the drawing, it's a change to the door family. Found on site, it's a new frame, new hardware and another inspection.
Upload a floor plan. CodeLens Studio pins egress, access and energy issues on the sheet. Each one shows the clause, what was measured, the limit and a suggested fix, in about two minutes per sheet.
The fix itself is usually small: a door re-hung, a partition moved, a cubicle widened. The cost is everything that comes after: drawings re-issued, consultants re-engaged, the program pushed back, and a call to the client explaining why.
Found on the drawing, it's a change to the door family. Found on site, it's a new frame, new hardware and another inspection.
Travel distance creeps as fit-outs change. One more meeting room and a floor that passed last month doesn't pass any more.
On a tight amenities plan it's easy to miss. Once the joinery and partitions are ordered, it's expensive to fix.
Surveyors notice which practices' drawings arrive clean. So do clients, when their permit isn't held up by a door swing.
Set the sliders to match how your practice checks drawings today. The calculation is shown in full below, so you can check it.
How it's calculated: sheets × (your manual minutes − 10 minutes to review the pins and confirm the drawing facts) ÷ 60. The drawing read itself runs in the background while you work. This counts first-pass checking time only. It doesn't count the cost of an issue found late, which is usually the larger number.
A language model is good at reading a plan: room names, door swings, where the stairs are. It shouldn't be the one deciding whether 40.7 m meets the limit. In CodeLens it doesn't. The limit comes from rules code written from the NCC text, and the code gives the same answer every time.
Drop in a PDF sheet set exported from Revit, Archicad or AutoCAD. Floor plans are pre-selected, and you choose which sheets to check.
Rooms, uses and areas, doors and swings, exits, paths of travel, sanitary banks and the drawing scale. Any of it can be corrected, and corrections re-run the checks for free.
Occupant numbers from Table D2D18, then travel distance, exit and door widths, door swing and latches, ambulant cubicles, signage, class separation, EV and solar.
Each issue is pinned where it occurs. Assign it, comment on it, mark it as a Performance Solution. When a re-read drawing no longer has the problem, it closes on its own.
The checks cover commercial work under Volume One: Class 3, 5, 6, 7, 8 and 9 buildings. Each finding links to the official clause on NCC Online. More clauses are added with each release.
| Clause | Check | What CodeLens does |
|---|---|---|
| D2D182019: D1.13 | Number of persons | Counts occupants from room areas and Table D2D18 rates, or seat counts where higher. |
| D2D52019: D1.4 | Exit travel distance | Measures the walking route on the calibrated plan against the 20 m, 30 m and 40 m limits. |
| D2D32019: D1.2 | Number of exits | Flags single-exit storeys where effective height is over 25 m. |
| D2D8 · D2D92019: D1.6 | Exit, path and door widths | Checks the 1 m path width, aggregate exit width for the population, and the 750 mm doorway minimum. |
| D3D252019: D2.20 | Swinging doors | Finds required-exit doors swinging against egress, and allows for the 200 m² and sanitary-compartment exemptions. |
| D3D262019: D2.21 | Operation of latch | Flags keyed locks and lever-plus-deadbolt hardware on exit doors. |
| F4D5 · D4D72019: F2.4 · D3.6 | Accessible amenities and signage | Checks ambulant cubicles at each toilet bank, and Braille/tactile and ambulant door signage. |
| C3D92019: C2.8 | Separation of classifications | Finds different classes side by side on a storey without a fire wall. |
| J9D4 · J9D5New in 2022 | EV charging and solar PV | Sizes EV distribution boards and circuits per carpark storey, and solar PV from conditioned area and climate zone. |
Your name is on the drawings, so you need to see why each issue was raised. Here's how.
Measured on your calibrated plan, read from the drawing, or taken from project facts. You can see which, and how much weight to give it.
If a room use or door swing was read wrong, change it. The checks re-run straight away, at no cost.
Every clause opens the official wording on ABCB's NCC Online, with state variations noted where they apply.
People sign in with your practice email domain, and only they can see your projects. No passwords to manage: Cloudflare emails a one-time sign-in code.
Drawings are stored on Cloudflare in the Oceania region and are never used to train models.
CodeLens helps you send cleaner drawings. Your building surveyor still determines compliance, and CodeLens says so on every report.
Try it on a live project with your own drawings. If it doesn't find something worth fixing, you've lost an afternoon.